Timber Frame construction takes less time on site than traditional build methods, so the overall site infrastructure costs are therefore reduced.
No we can only provide the timber framed kit as described.
Our design phase normally takes 4 – 6 weeks depending upon the complexity of your project. Then, current workload permitting, we can start work on site.
Yes, we usually can provide an accurate budget price at that stage, with enough detail to allow you to make an informed decision.
No we build the kit on site, saving factory and haulage costs.
It depends upon our current work load and its complexity, but usually about 2 weeks for a house, less for extensions and smaller works.
Supply and fit of the timber framed parts of the external walls, internal walls, middle floor and roof. This includes the panel drawings and structural calculations that are required.
Yes – I’m Iain and Lindisfarne Timber Frame is my company. I'm a Quantity Surveyor and will usually be on site with my father (Geoff) and my cousins John and Peter, who are joiners. Together we have over 100 year’s of timber framing experience between us!!!
No, we cannot provide these, but we may be able to put you in touch with someone who can.